|
Over
time Link-Pipe
has delivered consistently satisfactory service to its customers.
Some of our
customers have written to us about their experiences. The number of unsolicited
testimonials offer us the encouragement to improving our product and
service even better.
Here is what a few of our many satisfied customers say about our
products and outstanding installation performance.
These are reproduced from original testimonials. Copies
are available on request.
MIDWAY
SEWER DISTRICT
PO
Box 3487. Kent WA 98032-0209.3030S 240 St.
For
the past 7 years, we have done sewer rehabilitation projects of
approximately $50,000 per year. These projects have consisted of
digging up sewer lines to repair problems such as root intrusions or
cracked and broken sewer mains. Our average cost per repair on these
projects has been $3,500. We are always looking for ways to maximize
the amount of repairs accomplished per dollar spent, and have tried
products such as epoxy grouting, fiberglass and PVC lines, and pipe
bursting with HDPE pipe.
In
1995 we had our first encounter with Link-Pipe sleeves, when we had
them installed by a contractor in two cracked 8” sewer mains. We
were impressed with the ease of installation, with the mechanical
lock, which insures the sleeve will remain in position, and with the
expected durability of the stainless (steel) sleeve material.
We
were pleased to be offered the opportunity to purchase the equipment
and supplies, so that our crews could install the sleeves. To date
we have installed approximately 100 sleeves in 45 locations. Our
crew’s average 4 sleeves installed per day on 8” line. Our costs
per repair average $800, which includes labor and materials.
This
product has allowed us the flexibility of installing the sleeves at
our convenience, and
is proving to be very cost effective. We are pleased with the
results, and anticipate continued use of this product in the future.
Walter
Crahan / Supervisor of Maintenance
CITY
OF NORTH YORK PUBLIC
WORKS DEPARTMENT
5100
Yonge Street, North York, Ontario M2N 5V7
“The
Link-Pipe Sleeves have been installed in the past in North York,
with satisfactory performance. In fact we recently
inspected a sleeve installed approximately 10 years ago and found it
to be in excellent condition.
Link-Pipe
Sleeves, or equivalent, will continue to be considered as
alternatives in the future for spot repair in our sewer
rehabilitation programme.”
Mario
Crognale, P. Eng.,
Director
of Water & Sewer Operations
Metropolitan
Government Of Nashville and Davidson County
Department
Of Water and Sewerage Services 1616 Third Ave. North, Nashville,
Tennessee 37208-2206
In
the past year I have worked with employees of Link-Pipe and U.S.
Sewer in the installation of Link-Pipe Grouting Sleeves in a 42”
and 30” sanitary sewer and a 24” sleeve in a storm drain for the
City of Nashville. The Link-Pipe and U.S. Sewer employees have been
very professional in their work. I was impressed in the simplicity
of the installation of the sleeves and we had several joint leaks
that were sealed in the process. After the work in the 42”
sanitary sewer our crew went back about a month later and did T.V.
Inspection of the lines that were sealed. The sleeves were holding
and the joint leaks were sealed. This is a good product and has a
place in a sewer rehab program.
We
are presently in the process of forming a crew in house to install
the Link-Pipe Sleeves.
Steve
Walker/ Engineer Tech 3
Ronnie
Russell/ System Services Assistant Manager.
BOARD
OF PUBLIC UTILITIES
Operations
& Maintenance Division P.O Box 1469-2406 Snyder
Av. Cheyenne, WY 82003-1469
Re:
New Technology – Link-Pipe
Recently,
the Cheyenne Board of Public Utilities installed several units of
“Link Pipe” used as point repairs in the sanitary sewer system.
Three
separate mains were previously identified as having major
deficiencies in the pipe. They were all scheduled for relining at a
cost of $183,000.00. Upon Pace Construction's demonstration and
training of a Cheyenne BOPU utility crew, it was determined locally
that point repairs, using "Link Pipe” would be much more
economical than relining or replacing.
Using
a tele-video camera to precisely locate the “Link Pipe” segment,
repairs were rapidly completed (less than two days), without
excavation. Overall, the BOPU realized a savings on these three
mains of over $175,000.00.
The
installation process is very straightforward and easy to accomplish.
Localized point repairs, when grades are proper, are economically
repaired without excavation, or high cost of relining. The new
technology extends our resources as well as the mains
serviceability. As a result, funding can be used in other upgrades
where point repair is not feasible.
I
highly recommend the new technology to other utilities faced with
similar problems. We thank Pace Construction Inc. for introducing us
to this new technology.
We
look forward in working with your company in the future and
unquestionably requisitioning additional “Link Pipe" material
in the future.
Chuck
Blackburn, Manager
Operations
& Maintenance
DEPARTMENT
OF THE ARMY
Seattle
District. Corps. Of Engineers. P.O Box 3753 Seattle Washington
Subject:
Outstanding Contractor Performance Evaluation. Contract No.
DACA67-95-C-0125, Repair Murray Creek Sewer line, Ft. Lewis, WA
Serial
Letter No.8
TSR
Corporation
P.O
Box 297
Wilsonville,
OR 97070
I
note with great pleasure that your firm received an outstanding
performance evaluation for construction of the referenced contract.
Few contractors earn this high evaluation. You rate among the best.
Fort
Lewis Area Office rated you outstanding for quality of workmanship,
timely performance, effectiveness of management, labor standard
compliance and safety. In essence, your staff and subcontractors
provided a superb
product, on time to the customer. I received numerous compliments on
your work. You can be proud of your accomplishments.
Please
convey my appreciation to your entire organization and
subcontractors for a job well done. The Area Office asked that I
particularly recognize Rose and Mike Loomis, and Mike Bergeron for
their fine effort of bringing this project to its successful
completion. Your subcontractors, Traffic Control Services, Link- Pipe
Inc., and Gelco all provided commendable support and were
instrumental in the success of this project.
Thank
you for making this project so successful. Good
luck with your ongoing and future Government contracts.
Mary
J. Higley
Contracting
Officer
|